Beginning the Pool Dig (11-17-01)

The dig took two days. The first morning, the Bobcat pulled all the stumps and fence posts in the way & made a path to the front yard. Then it steadily dug a hole, pulled dirt out of the backyard & loaded it onto two dump trucks. Skelly was kind enough to take the fill dirt and bricks on his property.

Click on any of the photographs below to view a full sized version. 

Use your browser's "Back" button to return to this page.

Use the "INDEX" link (upper-right) to return to the Photo Index Page.

 
pool005.JPG (114514 bytes) pool007.JPG (100473 bytes) pool008.JPG (92987 bytes) pool009.JPG (109042 bytes) pool010.JPG (101404 bytes) pool011.JPG (113719 bytes)
pool012.JPG (114335 bytes) pool013.JPG (113474 bytes) pool014.JPG (80308 bytes) pool015.JPG (46918 bytes) pool016.JPG (76012 bytes) pool017.JPG (95977 bytes)
pool018.JPG (105438 bytes)