2003 San Felipe 250 (03-15-03) |
||||||||||||||
The motor & transmission where barely in three days before the car was towed to San Felipe. It was preped for contingency, run through tech inspection, rushed out to the course for some final shock tuning, and final race-prep the evening before the race. |
||||||||||||||
More photos of the race at: http://www.dirtfocus.com |
||||||||||||||
|
Thursday | |||||
---|---|---|---|---|---|
Pre-Contingency Preparations | |||||
Pre-Race Testing | |||||
Pre-Race Preparations | |||||